Redecorating continues
Well the tile floor is in and grouted. Who knew? I could do it, Home Depot helped (by allowing me to purchase materials). The toilet is reinstalled, and can I just say if you're going to do this, have good ventilation and keep all ports sealed as long as possible!
We have also finished up the caulking around the shower and the toilet. After installing the light fixture, we're down to just:
- installing the vanity and sink
- installing the medicine cabinet
- reinstalling the wall mirror
- installing the base trim
- install 1 piece of the door trim
- installing towel bars
- install threshold (although this may wait for final until the other flooring is done)
- installing the door stop and any final touches
The place is really shaping up from the hole it used to be. And to think, it's all thanks to Roxie for starting to tear up the linoleum when she was penned in there. Thanks Roxie.
Before and after pics will be a separate post when it's all completed...
1 Comments:
Three updates in four days?
Who are you and what have you done with the real KennyG?
Post a Comment
<< Home